翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Great Belt Bridge : ウィキペディア英語版
Great Belt Fixed Link

The Great Belt Fixed Link ((デンマーク語:Storebæltsforbindelsen)) runs between the Danish islands of Zealand and Funen. It consists of three structures: a road suspension bridge and a railway tunnel between Zealand and the small island Sprogø located in the middle of the Great Belt, and a box girder bridge for both road and rail traffic between Sprogø and Funen. The "Great Belt Bridge" (Danish: ''Storebæltsbroen'') commonly refers to the suspension bridge, although it may also be used to mean the box-girder bridge or the link in its entirety. The suspension bridge, officially known as the East Bridge, has the world's third longest main span (1.6 km), and the longest outside of Asia. It was designed by the Danish engineering firms COWI and Ramboll.
The link replaced the ferry service that had been the primary means of crossing the Great Belt. After more than five decades of speculation and debate, the decision to construct the link was made in 1986; the original intent was to complete the railway link three years before opening the road connection, but the link opened to rail traffic in 1997 and road traffic in 1998. At an estimated cost of DKK 21.4 billion (1988 prices),〔 the link is the largest construction project in Danish history.
Operation and maintenance are performed by ''A/S Storebælt'' under ''Sund & Bælt''. Construction and maintenance are financed by tolls on vehicles and trains.
The link has reduced travel times significantly; previously taking about an hour by ferry, the Great Belt can now be crossed in about ten minutes. The construction of the link and the Øresund Bridge have together enabled driving from mainland Europe to Sweden and the rest of Scandinavia through Denmark. Cyclists are not permitted to use the bridge, but cycles may be transported by train or bus.
== History ==
The Great Belt ferries entered service between the coastal towns of Korsør and Nyborg in 1883, connecting the railway lines on either side of the Belt. In 1957, road traffic was moved to the HalsskovKnudshoved route, about 1.5 kilometres to the north and close to the fixed link.
Construction drafts for a fixed link were presented as early as the 1850s, with several suggestions appearing in the following decades. The Danish State Railways, responsible for the ferry service, presented plans for a bridge in 1934. The concepts of bridges over Øresund (152m DKK) and Storebælt (257m DKK) were calculated around 1936.〔Marstrand, Wilhelm. "(Det store vej- og broprojekt )" ''Ingeniøren'', 14 March 1936. Accessed: 2 December 2014.〕 In 1948, the Ministry for Public Works (now the Ministry of Transport) established a commission to investigate the implications of a fixed link.
The first law concerning a fixed link was enacted in 1973, but the project was put on hold in 1978 as the Venstre (Liberal) party demanded postponing public spending. Political agreement to restart work was reached in 1986, with a construction law ((デンマーク語:anlægslov)) being passed in 1987.
The design was carried out by the engineering firm COWI together with Dissing+Weitling architecture practice.
Construction of the link commenced in 1988. In 1991, Finland sued Denmark at the International Court of Justice, on the grounds that Finnish-built mobile offshore drilling units would be unable to pass beneath the bridge. The two countries negotiated a financial compensation of 90 million Danish kroner, and Finland withdrew the lawsuit.
The link is estimated to have created a value of 379 billion DKK after 50 years of use.〔(Economic analysis )〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)